Afro-Meet
Sign in
Afro-Meet
Toggle sidebar
ENCO2
Port-Gentil, GA
ENCO2

ENCO2

Training | Engineering | Procurement | Construction

Service zones
🇬🇦 Gabon 🇨🇲 Cameroun 🇨🇩 Congo RDC 🇨🇬 Congo Brazzaville
835

Our areas of expertise

See all

Our Services

Training | Engineering | Procurement | Construction

ENCO2, located in Port-Gentil, Gabon, is an engineering, construction, and technical services company that supports organizations in optimizing their projects through a comprehensive range of services, including professional training on software such as Primavera P6, Power BI, and Microsoft Project, technical assistance, engineering studies, project management, and industrial equipment supply, with particular expertise in the oil and gas sectors.

Our Services
Our Services
Our Services

Pricing plans for everyone

Flexible plans crafted to help you get the most out of this service.

Primavera P6 Pack (Advanced Level)

275,000.00
XAF

Advanced level

  • Registration: 25,000 F CFA
  • Program: Advanced Primavera P6 – Power BI – MS Project Training
  • Objective: Deepen skills in project planning, resource management, and advanced reporting.

Primavera P6 Pack

190,000.00
XAF

Intermediate level

  • Registration: 25,000 F CFA
  • Program: Primavera P6 Training
  • Target audience: Engineers, project managers, planners in industrial and oil & gas sectors.
  • Objective: Master project planning and tracking, data extraction, analysis, and reporting

Power BI Pack

295,000.00
XAF
  • Program: Power BI Training for performance monitoring, KPIs, and interactive dashboards.
Popular

Primavera P6 + Power BI Pack

475,000.00
XAF
  • Program: Comprehensive training combining Primavera P6 and Power BI with practical real-case exercises.

Galleries

Certificat

Certificat

Tableau de Bords Power BI...

Tableau de Bords Power BI...
Tableau de Bords Power BI...
Tableau de Bords Power BI...
Tableau de Bords Power BI...
Tableau de Bords Power BI...
Tableau de Bords Power BI...
Tableau de Bords Power BI...
Tableau de Bords Power BI...
Tableau de Bords Power BI...
Tableau de Bords Power BI...
Tableau de Bords Power BI...

Planning Primavera P6

Planning Primavera P6
Planning Primavera P6
Planning Primavera P6
Planning Primavera P6
Planning Primavera P6
Planning Primavera P6
Planning Primavera P6
Planning Primavera P6
Planning Primavera P6
Planning Primavera P6
Planning Primavera P6

Frequently asked questions

ENCO2 offers professional training in Primavera P6, Power BI, and Microsoft Project, designed for engineers, project managers, and planners in industrial and oil & gas sectors.
The main areas are: Training, Engineering, Procurement, Construction, Primavera P6, and Power BI.
ENCO2 mainly operates in Gabon, Cameroon, DR Congo, and Congo-Brazzaville.
There is a beginner/intermediate level (380,000 XAF) and an advanced level (550,000 XAF), each including registration and the full program.
Fill out the contact form on the website with your name, phone, email, preferred date, and message. ENCO2 typically responds within 24 hours.

Appointment request

Fill in the form to request a quote or book an appointment. We usually reply within 24h.

Your name
Phone
Email
Message
Type at least 2 characters to start searching.